Ready Access AA300 Especificaciones Pagina 21

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 44
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 20
20
2. Wire the AC source line to the Terminal Block located in the header of the window.
NOTE: THE GROUND WIRE (GREEN) IS ALWAYS IN THE CENTER OF THE
TERMINAL BLOCK. THE LINE (L1) IS INDICATED BY THE (RED) TAB AND THE
RETURN (NEUTRAL) IS INDICATED BY THE (WHITE) TAB.
3. Turn “ON” the power to the unit. (Load center circuit breaker and power switch on the
“Control Panel”.
4. Test window operations. See “Testing Procedures”.
AC Terminal Block
Vista de pagina 20
1 2 ... 16 17 18 19 20 21 22 23 24 25 26 ... 43 44

Comentarios a estos manuales

Sin comentarios